Curriculum Vitae
|
John Quirk Marine Seismic Exploration
Specialist |
|
|
Disciplines |
Project Supervision, Marine Acquisition, Navigation, Data
Processing, Technical Audits, HSE |
|
Qualifications |
BEng Parts I & II Engineering
Science and Industrial Management |
|
Background |
28 years worldwide acquisition experience since
1983. 8 years as an observer, senior
observer and party chief with geophysical contractor. Operating as an
acquisition consultant since 1991, John has wide experience of seismic and
navigation quality control and data processing. He also has training and
experience in project planning and management. |
|
Areas of Expertise |
|
|
Project Management |
|
|
Acquisition |
Supervision and quality control of 2D, 3D, 4D, multi-vessel and OBC
acquisition programmes. Geostreamer operations. Special respect is given to minimisation of 3D costs by use of
expedient shooting and infill programmes. Navigation of hazards, shallows and
high currents areas hold special interest. QHSE monitoring and advancement. |
|
Navigation |
Experience of quality control of 2D, 3D, 4D and OBC surveys. Navigation data processing of
2D, 3D and OBC data |
|
Processing |
Experience of both QC and on-board production seismic processing
systems. |
|
Software |
Extensive knowledge of MS Office and many other programmes in
popular use. Programming skills in Visual Basic. Several bespoke programmes
in use for QC and data logging. |
|
Mapping |
Preparation of survey maps, charts and attribute displays using GIS
software. |
|
Technical Experience |
|
|
Project Management |
Formal management and project control training.
Experienced in all aspects of marine survey techniques, specifications,
safety, logistics, technical support. Contract design and appraisal. Survey
design and planning. Bespoke control and reporting systems. |
|
Instrumentation |
Geostreamer, WG
Q system, NESSIE, Syntrak, MSX, Sercel
Seal, TriAcq, DFS V, LRS-16, DSS 240, LRS-16A,
WG-24 |
|
Energy Sources |
Bolt airguns,
Sleeve guns, G Guns, Sodera Airguns |
|
Energy Source Control |
TriSource, GCS-90, I/O SSS, Litton LRS-100, GunLink,
Class, Gunda, GunCo,
Horizon ISC, Tiger, Hydropulse, BigShot,
DigiShot. |
|
Positioning Systems |
StarFix, SkyFix, Syledis, Pulse 8,
Loran C, HyperFix, Microfix,
Argo, Artemis, C-Net, MultiFix, MRDGPS, VeriPos, SeaDiff, LandStar |
|
In-Sea Positioning |
Digiourse full streamer acoustics, Irma Full Streamer Acoustics,
Racal SkyTrak rGPS, Fugro
BuoyTrak rGPS, VeriPos
rGPS, LaserTrak, MDL Fanbeam,
MARS Laser, SSTS, Sonardyne acoustics (SIPS), DigiCourse acoustics, NavTech
Acoustics, Buoylink. |
|
Navigation Systems |
Orca, Concept System Spectra &
NRT, Western WISDOM, Geco Norstar,
Geco TriNAV, SeisNet, QPS Qinsy, NCS. |
|
Binning Systems |
Concept System Reflex, I/O Census, Qube(own system) |
|
Streamers |
PGS Geostreamer, WesternGeco Q, Seal
solid & liquid filled, LRS-16/16A, Digicon DSS
240, Syntrak 480 & RDA, WG-24, HSSG, NESSIE IV
& V, I/O MSX, Ion DigiStreamer |
|
Navigation Processing |
Geometis, Neptune, Sirius, QCPro, Sprint, UnavChk, SeisNav, Qsolve, Spectra NRT. |
|
Seismic Processing |
HoloSeis, Viper, ProMax, Cobra,
Tango, Omega, Ramesses, MicroMax,
Focus, Cube Manager, Hot Shot, Vista |
|
Technical Audits |
Pre-survey tests of seismic
recording system and source integrity. Hydrophone sensitivity tests and
far-field gun signature tests. Approval of navigation systems and spread
geometry. |
Professional
Experience
|
||
|
Company |
Dates |
Description
|
|
Geophysical Quality Services Ltd. |
2005-> |
Seismic
acquisition consultant. Survey
supervision, quality control of seismic and navigation data on marine seismic
surveys. |
|
Exploration Consultants Ltd |
1996-2005 |
Seismic
acquisition consultant. Survey supervision, quality control of seismic and
navigation data on marine seismic surveys. |
|
Quirk Services Ltd |
1995 - 1996 |
Independent
Seismic QC & Computer
Services Consultant |
|
Hydrosearch
Associates |
1993 - 1995 |
Seismic
acquisition consultant. Survey
supervision, quality control of seismic and navigation data on marine seismic
surveys. |
|
Exploration Consultants Ltd |
1991 - 1993 |
Seismic
acquisition consultant. Survey supervision, quality control of seismic and
navigation data on marine seismic surveys. |
|
Digicon |
1983 - 1990 |
Observer,
senior observer and Party Manager of seismic survey vessel. |
|
Seymour Electrics |
1980 - 1983 |
Contract
Manager of small electrical contracting company |
|
Guthrie & Partners |
1979 - 1980 |
Quantity
surveyor engaged on support program for BAE tornado project |
|
H H Robertson |
1977 - 1979 |
Project
supervisor for construction of mobile food storage units for school meals
program in Saudi Arabia. |
|
Student |
1973 - 1977 |
NE
Liverpool Tech & Liverpool University |
|
Edward Carter Ltd |
1972 - 1973 |
Electrical
Technician in small contracting company. |
|
Merseyside & North Wales Electricity Board |
1967 - 1971 |
Apprentice
Electrician 1967-1970 Electrician
1970-1971 |
|
Technical Training |
|
|
|
Geostreamer QC Techniques |
2011 |
PGS |
|
Geostreamer QC Techniques |
2010 |
PGS |
|
Q-Marine Technology |
2006 |
WesternGeco |
|
Neptune Navigation Processing |
2002 |
ECL |
|
Navigation Processing |
1996 |
ECL |
|
Internet programming |
1996 |
Liverpool University |
|
Unix |
1996 |
Liverpool University |
|
C Programming |
1993 |
John Moores
University |
|
Safety Training |
|
|
|
Short Range Radio Operator |
2008 |
Safe Water Training Sea School |
|
10m Powerboat Cox |
2007 |
Safe Water Training Sea School |
|
LRAD 1000 |
2007 |
CGGVeritas |
|
Offshore Survival & HUET |
2006 |
Fleetwood Offshore Survival Centre |
|
Defensive Driving Course |
2005 |
Lancashire County Council |
|
Safety Management Course |
2002 |
Thonger GSR |
|
Safety Management Course |
2000 |
PGS |
|
Advanced First Aid |
1999 |
PGS |
|
Safety Management Course |
1991 |
Shell (NAM) |
Past Projects
![]()
|
Client Country |
Dates |
Survey Description |
Responsibilities. |
|
Chinampa Papua New Guinea |
Nov-Dec 2011 |
3D Marine.BGP
Prospector: 10 x 6000m Ion DigiStreamers, 2 x 4200 in3
source. Main challenges: Inadequate contractor house QC
system, inexperienced crew, new vessel not fully set up, high and erratic
currents. |
Supervision, HSE & Acquisition. |
|
PGS Multiclient North Sea |
Jun-Sep 2011 |
3D Marine. PGS Apollo: 10 x 7000m Geostreamers,
2 x 4135 in3
source. Main challenges: Seismic interference, weather,
feather matching. |
Supervision, Acquisition, Navigation & HSE. |
|
Chinampa Papua New Guinea |
Feb-Apr 2011 |
3D Marine. BGP Explorer: 3 x 6000m mixed Seal
solid/liquid streamers. Main challenges: Feather matching, HSE,
inexperienced crew. |
Supervision, HSE & Acquisition. |
|
CPOC Thailand |
Nov-Dec 2010 |
3D Marine. Fugro RV SeisQuest: 8 x 600om Seal solid streamers. Full streamer
Digicourse acoustics with Digifins. Main challenges: Feather matching. |
Navigation. |
|
StatoilHydro North Sea |
Oct 2010 |
4D Marine. PGS Ramform Valiant: 12 x 6000m
Geostreamers, 2 x 4135
in3 source. Main challenges: Feather matching. |
Supervision, Acquisition, Navigation & HSE. |
|
PGS Multiclient North Sea |
Jul-Oct 2010 |
3D & 4D Marine with undershoot. PGS Ramform Valiant: 12 x 6000m geostreamers, 2 x 4135 in3 source. Main challenges: new technology (geostreamer), software upgrade (Orca v1.8 with patches),
timeshare, oilfield obstructions, dual axis binning grid, undershoot. |
|
|
Petrom Romania |
Oct-Nov 2009 |
3D Marine. Fugro
Geo Celtic: 10 x 8000m steerable streamers, 2 x 4300 in3
source. Main challenges: strong unpredictable currents. |
Navigation. |
|
Zaratex Sumatra |
July-Sept 2009 |
3D Marine. CGGV Geowave
Champion: 10 x 6000m streamers, 2 x 3460 in3 source. Main challenges: Fixed fishing equipment,
strong currents, shallow water, heavy traffic, unsuitable vessel. |
Supervision, Acquisition. |
|
TPAO Turkey |
Dec 2008-June 2009 |
2D & 3D Marine. CGGV Viking Vanquish: 10 x 8000m streamers, 2 x
5085 in3 source. Malene Ostervold, 1 x 8000m streamer, 1 x 4100 in3
source. Main challenges: strong unpredictable currents. |
Supervision, Acquisition, Navigation, Technical
Audit, HSE. |
|
PGS Norway |
July-Oct 2008 |
3D Marine. PGS Ramform Vanguard: 8 x 6000m streamers, 2 x 3090 in3
source. Main challenges: straight forward open water
survey. |
Navigation. |
|
StatoilHydro Norway |
May-July 2008 |
3D & 4D Marine. Multiwave, GeoWave Champion: 8 x 5000m streamers, 2 x 3460
in3 source. Main challenges: fishing, oilfield
obstructions. |
Supervision, Acquisition, Processing & HSE. |
|
Petronas Timor Leste |
Sep-Oct 2007 |
3D Marine. CGGV MV Orion: 6 x 6000m streamers, 2 x 2940 in3
source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, Processing & HSE. |
|
Petronas Malaysia |
Sep 2007 |
3D Marine. CGGV MV Orion: 6 x 6000m streamers, 2 x 2940 in3
source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, Processing & HSE.
|
|
TPAO Turkey |
June -Aug 2007 |
Q-Marine. WG, Western Monarch: 10 x 6000m streamers, 2 x 3147 in3
source. Main challenges: strong unpredictable currents. |
Supervision, Acquisition, Navigation,
Processing & HSE. |
|
TPAO
|
May 2007 |
2D Marine. Fugro,
Geo Arctic: 1 x 7200m streamer, 1 x 3410 in3 source. Main challenges: strong unpredictable currents. |
Supervision, Acquisition, Navigation, Technical Audit, HSE |
|
TPAO Turkey |
July 2006-Jan 07 |
Q-Marine. WG, Western Pride: 8 x 6000m streamers, 2 x 3147 in3 source. Main challenges: strong unpredictable currents,
weather. |
Supervision, Acquisition, Navigation, Technical
Audit, HSE |
|
TPAO Turkey |
July-Dec 05 |
2D Marine. Multiwave,
C-Orion: 1 x 8000m streamer, 1 x 5100 in3 source. Main challenges: strong unpredictable currents,
weather. |
Supervision, Acquisition, Navigation, Technical
Audit, HSE |
|
Kosmos Ghana |
Feb-Mar 05 |
3D Marine. Veritas, SeisQuest: 8 x 4500m streamers, 2 x 3600 in3 source. Main challenges: straight forward open water
survey. |
Navigation |
|
TPAO Turkey |
Apr-Oct 04 |
2D Marine. Fugro, Nalivkin: 1 x 6000m streamer, 1 x 4600 in3 source. Main challenges: strong unpredictable currents,
weather, close coastal approaches. |
Supervision, Acquisition, Navigation, HSE |
|
INOC Iran |
Apr 04 |
3D Marine. INOC, Pejwak: 4 x
3000m streamers, 2 x 3000
in3 source. Main challenges: equipment deficiencies. |
Acquisition, Navigation |
|
Reliance India |
Oct 03-Jan 04 |
2D & 3D Marine. PGS, Ramform Challenger: 8 x 6000m streamers, 2
x 3090 in3 source. Main challenges: fishing, currents. |
Supervision, Acquisition, Navigation, HSE |
|
Petro-Canada Tunisia |
Aug-Sept 03 |
2D Marine. Wavefield,
Discoverer: 1 x 4050m streamer, 1 x 3000 in3 source. Main challenges: shallow water, fishing. |
Supervision, Acquisition, Navigation, HSE |
|
GSPC. India |
Mar-Jun 03 |
3D Marine. PGS, Ramform Vanguard: 8 x 4800m streamers, 2 x
source. Nordic Explorer: 6 x 4800m streamers, 2 x 3090 in3
source. Main challenges: shallow water, fishing. |
Supervision, Acquisition, Navigation, HSE |
|
Reliance India |
Sep 02-Feb 03 |
3D Marine. PGS, Ramform Vanguard: 8 x 6000m streamers, 2 x
3090 in3 source. Main challenges: currents, fishing. |
Supervision, Acquisition, Navigation, HSE |
|
Amerada Hess
|
May-July 02 |
3D Marine. WG, Geco Eagle: 8 x
6000m streamers, 2 x 3147
in3 source. Main challenges: straight forward open water
survey. |
Processing |
|
Reliance India |
Sep 01-Feb 02 |
2D & 3D Marine. Shore based coordinator for four surveys. Main challenges: merging client and contractor
expectations. |
Project Management |
|
Nunaoil,
DONG Greenland |
Aug-Sept 2001 |
2D Marine. TGS, Zephyr 1: 1 x 6000m streamer, 1 x 2940 in3 source. Main challenges: currents. |
|
|
Chevron China |
July 2001 |
3D Marine COGNC, Dong Fang Ning
Zhu: 4 x 6000m streamers, 2 x 3000 in3 source. Main challenges: currents. |
|
|
Tullow India |
Apr-May 01 |
2D Marine. PGS, Orient Explorer: 4 x 4500m streamers, 2 x 2500 in3 source. Main challenges: currents. |
Supervision, Acquisition, Navigation, HSE |
|
Cairn Energy India |
Jan-Apr 01 |
3D Marine & Undershoot. WG, Western Horizon: 2 x 2000m streamers, 2 x 1500 in3
source. Main challenges: currents, oilfield obstructions. |
Supervision, Acquisition, Navigation, HSE |
|
Dana Petroleum Mauritania |
Oct-Dec 2000 |
2D Marine. Veritas,
New Venture: 1 x 6000m streamer, 2 x 3450 in3 source. Main challenges: straight forward open water
survey, weather. |
Supervision, Acquisition, Navigation, HSE |
|
Phillips & NunaOil
Greenland |
Jul-Sep 2000 |
2D Marine. HMDS, Thetis: 1 x 6000m streamer, 1 x 4100 in3
source. Main challenges: currents. |
Supervision, Processing, Acquisition,
Navigation, HSE |
|
MossGas South Africa |
Apr-Jun 2000 |
3D Marine. Aker, Aker Amadeous:
8 x 6000m streamers, 2 x 3600 in3 source. Main challenges: fishing. |
Navigation |
|
PGS Australia |
Jan-Mar 2000 |
3D Marine. PGS, Ramform Challenger: 8 x 4500m streamers, 2
x 3090 in3 source. Main challenges: straight forward open water
survey, currents. |
Supervision, Acquisition, Navigation, HSE |
|
Arabian Oil Company
|
Oct-Dec 1999 |
3D Marine & Undershoot. Western Geophysical, Western Horizon: 2 x 4000m
streamers, 2 x 1500
in3 source. Main challenges: oilfield obstructions, traffic. |
Supervision, Acquisition, HSE |
|
Philips Greenland |
July-Aug 1999 |
2D Marine. TGS, Polshkov: 1 x
6000m streamer, 1 x 3800
in3 source. Main challenges: straight forward open water
survey, currents, vessel & equipment. |
Supervision, Acquisition, Navigation, HSE |
|
YPF Brazil |
May-July 1999 |
3D Marine. Western Geophysical, Western Atlas: 4 x 4800m
streamers, 2 x 3000
in3 source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, HSE |
|
PGS Australia |
Dec 1998 - March 1999 |
3D Marine. PGS, Orient Explorer: 4 x 3750m streamers, 2 x 2500 in3 source. Main challenges: shallow water, currents. |
Supervision, Acquisition, HSE |
|
Norsk Agip Norway |
Oct-Nov 1998 |
3D Marine. Fugro,
Geo Pacific: 6 x 2600m streamers, 2 x 1940 in3 source. Main challenges: straight forward open water
survey, inexperienced crew. |
Supervision, Acquisition, Navigation, HSE |
|
Arco Irish Sea |
Sept 1998 |
3D Marine. Horizon, Labradour
Horizon: 4 x 8000m streamers, 2 x 1500 in3 source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, HSE |
|
Nunaoil/DONG Greenland |
July-Aug 1998 |
2D Marine. HDMS, HDMS THetis: 1
x 6000m streamer, 1 x 4100
in3 source. Main challenges: straight forward open water
survey, currents. |
Supervision, Acquisition, Navigation, HSE |
|
Primeline China |
Apr-June 1990 |
2D Marine. COGNC, Bin Hai 512: 4
x 6000m streamers, 1 x 2850
in3 source. Main challenges: straight forward open water
survey, inexperienced crew. |
Navigation |
|
DONG Denmark |
Apr 1998 |
2D Marine. HDMS, HDMS THetis: 1
x 6000m streamer, 1 x 4100
in3 source. Main challenges: straight forward open water
survey, currents. |
Supervision, Acquisition, Navigation, HSE |
|
Kerr McGee China |
Nov 1997–Mar 1998 |
OBC. COGNC, Bin Hai 504. Main challenges: inexperienced crew, fishing,
weather. |
Navigation |
|
Nunaoil/DONG
|
Jun-Sept 1997 |
2D Marine. HDMS, HDMS THetis: 1
x 6000m streamer, 1 x 4100
in3 source. Main challenges: straight forward open water
survey, currents. |
Supervision, Acquisition, Navigation, HSE |
|
BHP Australia |
Mar-Apr 1997 |
3D Marine. PGS, Orient Explorer: 4 x 4050m streamers, 2 x 2500 in3
source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, HSE |
|
Enterprise UAE |
Dec 1996-Feb 1997 |
OBC PGS, Jonathon Chouest. Main challenges: unreliable equipment. |
Navigation |
|
Shell USA |
Nov-Dec 1996 |
Split offset 3D Marine PGS, Ramform Explorer: 14 streamers, 4 x 3090 in3 source. Main challenges: new techniques to be learnt. |
Navigation. |
|
Petro-Canada Nigeria |
Oct-Nov 1996 |
3D Marine. Geco, SeisRanger: 5 x 3984m streamers, 2 x 3000 in3
source. Main challenges: straight forward open water
survey. |
Navigation. |
|
Shell North Sea |
Sept 1996 |
3D Marine. CGG, Harmattan: 5 x
6000m streamers, 2 x x 3100 in3source. Main challenges: straight forward open water
survey. |
Navigation. |
|
Shell North Sea |
July-Aug 1996 |
3D Marine. CGG, Mistral: 4 x 6000m streamers, 2 x 3100 in3 source. Main challenges: straight forward open water
survey. |
Navigation. |
|
Hess North Sea |
July 1996 |
2D Marine SeaTeam, Mirfaks: 1 x 4500m streamer, 1 x 1500 in3source. Main challenges: unreliable equipment incorrectly
set up. |
Processing. |
|
Kerr McGee North Sea |
Sep 1995-Jan 1996 |
3D Marine, Polar Search: 5 x 6000m streamers, 2
x 4000 in3 source. Main challenges: weather. |
Supervision, Acquisition, HSE |
|
|
Oct 1994-July1995 |
Software Engineering course. Liverpool University. |
|
|
Isramco Isreal |
Oct 1994 |
2D Marine. Geco, SeisVenture: 1 x 6000m streamer, 1 x 4500 in3 source. Main challenges: straight forward open water
survey. |
Supervision, Acquisition, Navigation, HSE |
|
Fina
|
June-Sept 1994 |
3D Marine. Western Geophysical, Western Monarch: 4 x 3000m
streamers, 2 x 2250
in3 source. Main challenges: time sharing, currents. |
Supervision, Acquisition, HSE |
|
Marathon North Sea |
Mar-April 1994 |
3D Marine. Western Geophysical, Western Monarch: 4 x 3000m
streamers, 2 x 2250
in3 source. Main challenges: time sharing, currents. |
Supervision, Acquisition, HSE |
|
Geco North Sea |
Sep 1993-Feb 1994 |
3D Marine. Geco, Geco Topaz: 6 x 6000m streamers, 2 x source. Main challenges: fishing, weather. |
Supervision, Acquisition, HSE |
|
NAM North Sea |
May-July 1993 |
QuadQuad 3D
Marine. Geco, Geco My: 4 x 4500m streamers, 4 x source. Main challenges: multi-vessel operations,
currents. |
Supervision, Acquisition, HSE |
|
Enron Trinidad |
Jan-Apr 1993 |
Two Boat 3D & Undershoot. Digicon, Digicon Explorer: 1 x 600m streamer, 1 x source. Main challenges: weather, currents, oilfield
obstructions. |
Supervision, Acquisition, Navigation, HSE |
|
Saudi Aramco Saudi Arabia |
Nov-Dec 1992 |
3D Marine & Undershoot. Western Geophysical, Western Pride: 6 x 6000m
streamers, 2 x source. Main challenges: oilfield obstructions. |
Supervision, Acquisition, HSE |
|
NAM North Sea |
Jun-Sep 1992 |
QuadQuad 3D
Marine. Geco, Geco My: 4 x 3000m streamers, 4 x3162 in3
source. Main challenges: multi-vessel operations,
currents. |
Supervision, Acquisition, HSE |
|
Statoil North Sea |
Dec 1991-May 1992 |
QuadQuad 3D
Marine. Geco, Geco Rho/Tau: 4 x 4500m streamers, 4 x source. Main challenges: multi-vessel operations,
currents, weather. |
Supervision, Acquisition, HSE |
|
Shell Norge North Sea |
Sep-Nov 1991 |
QuadQuad 3D
Marine. Geco, Geco Sigma/My: 4 x 4500m streamers, 4 x source. Main challenges: multi-vessel operations,
currents, weather. |
Supervision, Acquisition, HSE |
|
NAM North Sea |
Apr-Aug 1991 |
2D & 3D Marine. Western Geophysical, Western Wave: 1 x 4500m
streamer, 1 & 2 x source. Main challenges: currents, unreliable
equipment, crew. |
Supervision, Acquisition, HSE |
|
Mobil
|
Apr 1991 |
VSP Maersk
Highlander. Main challenges: weather. |
Supervision |
|
British Gas Gabon |
Feb 1991 |
2D Marine. Geco, Geco Searcher: 1 x 3000m streamer, 1 x 6324 in3 source. Main challenges: straight forward open water
survey. |
|
|
Texaco
|
Jan-Feb 1991 |
2D Marine. Teledyne, Casey Chouest:
1 x 300m streamer, 1 source. Main challenges: weather, unorthodox vessel,
unorthodox equipment. |
Supervision, Acquisition, Navigation, HSE |